A machine breakdown can involve much more than a failed component. The underlying problem may sit within the PLC program, drive configuration, feedback signals, communication network or ageing control electronics.

Jasper Electronics brings these disciplines together. Our work covers on-site fault diagnosis, industrial electronic repair, obsolete-system support, drive conversions and complete machine automation. We investigate how the machine operates, identify what is preventing it from performing correctly, and engineer a practical solution around its production requirements.

01 / CONCRETE BLOCK PRODUCTION / SIEMENS S5

Restoring a Concrete Block Production Line after More than a Month of Downtime

Original CPU recovery · VIPA / IM306 diagnostics · STEP 5 STL analysis · Live I/O monitoring · Production verification

A concrete block manufacturer approached Jasper Electronics with a mixer control system that had remained out of service for more than a month. Previous replacement of the power supply, CPU and rack had not restored operation. The installed replacement CPU could not be accessed for online diagnostics and would not enter RUN.

The machine used a Siemens SIMATIC S5-115U control system with a CPU 943B, a VIPA SSM-BG42 module and IM306 interface modules. Our work uncovered several separate problems, each becoming apparent as the preceding fault was resolved.

Recovering the Original Controller

During our first visit on 8 October 2026, we assessed the installed equipment and requested the original CPU, power supply and rack for workshop testing.

On 9 October, the original assembly successfully entered RUN with a minimal test program. This established that the original CPU could execute a program and justified returning it to the machine for further diagnosis.

After reinstalling the original assembly and carrying out a memory reset and program restoration, we traced the remaining peripheral handshake fault to the VIPA SSM-BG42 assembly. The baseboard and its MD40 and MD45 daughterboards were investigated, and a replacement baseboard was sourced.

Restoring Communication with the Machine’s Inputs and Outputs

At the follow-up visit on 17 October, replacement of the VIPA baseboard allowed the CPU to run with the machine program. However, online monitoring revealed that some physical input signals were still not reaching the PLC correctly.

Further investigation identified a problem in the IM306 interface arrangement. Substitution with modules borrowed from the adjacent machine restored input/output operation, allowing the mixer to be tested in manual mode.

Following successful manual checks, replacement IM306 modules and the associated cable were sourced for installation and full automatic testing.

Finding the Final Fault during Automatic Operation

On 26 October, we installed and configured the replacement interface equipment, restoring the adjacent machine to operation.

The mixer controller also required a memory reset and restoration of its program and operating data after the shutdown period. Once the parameters and recipes had been reloaded, automatic testing exposed a further issue: the dosing sequence would not advance to feed material into the mixer.

Tracing the Sequence through Legacy STL Code

The complete PLC program was written in Siemens STEP 5 Statement List (STL). Diagnosing the stalled sequence required following instruction-level logic across multiple function blocks, internal flags, timers and feedback conditions.

By combining program analysis with live monitoring, we traced the dosing belt command through the PLC logic and identified a missing feedback condition at input I11.5. Monitoring the complete input byte, I11.0–I11.7, revealed that the signal was arriving at I11.6 instead.

Correcting the feedback connection to I11.5 allowed the sequence to proceed.

Verified through the Production Process

Following the wiring correction, the customer operated the complete process:

  • Material dosing into the mixer.
  • Mixing and transfer to the wet-side block-making machine.
  • Wet-side machine operation.
  • Dry-side operation and ring transport.

All systems were reported working normally, and the service intervention was successfully closed on 26 October 2026.

The Value of Systematic Fault Diagnosis

This recovery required workshop testing, PLC fault analysis, hardware substitution, live input/output monitoring and automatic sequence tracing. The controller recovery, peripheral interface faults and incorrectly connected feedback signal required more than a single component replacement.

By proving the original CPU’s basic operation and following each fault through to its cause, Jasper Electronics restored the existing control system and returned the production line to service without a full PLC conversion.

02 / STEEL SLITTING LINE / SIEMENS 6RA80

Commissioning a Siemens 6RA80 for a Steel Slitting-Line Winder

DC-drive conversion · Motor configuration · On-site commissioning

The Challenge

A steel slitting application required a Siemens SINAMICS DCM 6RA80 drive to operate with the existing DC motor and machine controls.

Jasper’s Approach

Jasper commissioned the 400 A drive for a 150 kW motor, adapting the previous 6RA70 parameters to the new drive and optimising field-current, armature-current, speed and field-weakening control.

The work also included machine enable signals, forward and reverse inching, drive-ready indication, contactor control and the speed reference.

The Result

Stable no-load operation was verified up to 1,400 rpm, followed by operation under load. At the end of the service visit, the drive was running under production conditions.

03 / KONECRANES / LONG & SHORT TRAVEL

A Cost-Effective Alternative to Konecranes Travel Drives

Travel-drive conversion · Control integration · Commissioning

The Challenge

Expensive and difficult-to-source original Konecrane drives were creating a maintenance challenge for a crane’s long-travel and short-travel systems.

Jasper’s Approach

Jasper evaluated the motors, braking arrangements, control signals and travel requirements, then selected and integrated suitable cost-effective alternative industrial VFDs. The conversion included parameter configuration, wiring modifications, testing and commissioning with the existing crane controls.

The Result

The crane retained its required travel performance while gaining a more accessible drive replacement option for future maintenance.

This project demonstrates a practical route beyond like-for-like OEM replacement when the application can be supported by a properly engineered conversion.

04 / LEGACY FEEDBACK / SIEMENS S7-300

Replacing Obsolete Encoders on a Locked Siemens S7-300 System

Encoder feedback · Signal conversion · Legacy compatibility

The Challenge

Both heads of a threading machine relied on obsolete Kübler absolute encoders. Available replacements had a different resolution, while the relevant Siemens S7-300 program block was locked and could not be modified.

Jasper’s Approach

Jasper developed a signal-conversion solution that translated the replacement encoder feedback into the position and count information expected by the existing controller.

The Result

Both threading heads were converted while retaining the original Siemens control program. The conversion has operated reliably since commissioning in 2022.

The solution addressed the compatibility problem at the feedback interface, allowing the machine to continue operating with obtainable replacement encoders.

05 / CUSTOM MACHINE / ALUMINIUM CONTAINERS

Engineering a Five-Station Automatic Stacker from the Ground Up

Custom automation · PLC/HMI development · Machine integration

The Application

For aluminium-container production, Jasper developed a complete automatic stacking machine—from the mechanical arrangement and lifting mechanism to the control panel, software and commissioning.

Jasper’s Approach

The system combined five independent stacking stations, pneumatic handling, sensor feedback and six VFDs communicating over Modbus. A custom PLC/HMI application provided automatic operation, manual testing, recipe management, alarms and live I/O diagnostics.

Drive frequency, motor current and DC-bus voltage were also available for monitoring, giving maintenance personnel useful information when investigating a fault.

The Result

The machine entered operation successfully, and the stacker development work led to further orders for four- and five-station machines.

06 / SIEMENS S7-300 / MIXER DIAGNOSTICS

Tracing False Motor-Current Readings to a Siemens S7-300 Analogue Module

S7-300 diagnostics · Analogue signals · Program upload · Module replacement

The Challenge

Two mixer motors appeared on the HMI as drawing approximately 30 amp even though they were stopped.

Jasper’s Approach

Jasper uploaded the Siemens S7-300 program and traced the displayed values back to the analogue input channels. The investigation found abnormally high raw input values that did not correspond to the motors’ actual condition.

The Result

Replacing the faulty analogue input module corrected the readings. The mixer was then checked and left under testing and observation.

This was a measurement fault within the control system: understanding the relationship between the physical machine, PLC input data and HMI indication was essential to locating it.

07 / ALLEN-BRADLEY SLC 500 / FURNACE CONTROL

Restoring an Allen-Bradley SLC 500 Furnace Start Sequence

SLC 500 online diagnostics · Sequence tracing · CPU programming · On-site testing

The Challenge

A furnace would not start despite receiving the operator’s command from the HMI.

Jasper’s Approach

Jasper secured the PLC program and HMI backups, then monitored the control sequence online to establish where the start process was being interrupted. The investigation traced the problem to intermittent timer and relay faults within the machine controls.

The Result

After the faulty components were replaced, the furnace started and machine operation was tested. A replacement PLC CPU was also programmed and verified on the machine.

The work combined SLC 500 software access with investigation of the external control circuit—following the start command through to the devices responsible for carrying it out.

Further Engineering Experience

08 / POWER PRESSES / CONTROL MODERNISATION

Power-Press Control-System Retrofits

Control retrofits · Panel work · Machine sequences

Rebuilding ageing control panels and machine wiring for aluminium food-packaging presses, with PLC/HMI development, VFD and servo integration, and encoder and electronic CAM interfaces. Serviceable components were retained where practical, with obsolete controls replaced according to the machine’s requirements.

09 / PIPE MILL / COORDINATED DRIVES

Pipe-Mill Drive Synchronisation

PLC control · Drive integration · Process coordination

Developing PLC-based control to coordinate forming and sizing drives while retaining an adjustable speed differential between the two sections. The completed system achieved stable synchronised operation with the process adjustment required by the line.

10 / 18 MACHINES / PRODUCTION MONITORING

Centralised Monitoring across 18 Production Machines

Distributed PLCs · Modbus communication · Data logging

Connecting individual machine PLC stations to a master PLC and central HMI through Modbus. Machine running hours could then be viewed and recorded from one location, supported by network connectivity and server-based monitoring.

11 / SIEMENS S7-400 / FURNACE CONTROL

Restoring CPU RUN and a Healthy PROFIBUS Network.

S7-400 CPU diagnosis · MPI / PROFIBUS · Memory transfer · Machine verification

The Challenge

The furnace-control PROFIBUS network was down and the S7-400 CPU would not enter RUN.

Jasper’s Approach

Established online access through MPI and uploaded the program. Investigated the communication fault, fitted a spare S7-400 CPU with the existing memory module, and checked the network. Traced remaining heater-enable issues in the logic so the production team could correct the operating settings.

The Result

The CPU entered RUN and PROFIBUS communication was healthy. The production team tested automatic and manual operation and reported the machine working correctly. A program backup was handed over.

12 / SIEMENS S7-200 / DRYER CONTROL

Separating an Analogue-Module Fault from the Remaining Machine Issue.

S7-200 support · EM235 analogue I/O · Program investigation · Fault isolation

The Challenge

An S7-200-controlled dryer required analogue-module support and investigation of persistent alarms.

Jasper’s Approach

Assisted with configuration and testing of the EM235 analogue module and uploaded the PLC program to investigate the alarm logic. Further checks traced the remaining alarms to a separate multiplexing card.

The Result

The analogue I/O was working correctly. Further work on the separate card remained necessary, giving the customer a clear next step.

13 / ALLEN-BRADLEY SLC 5/03 / 1747-L532

Repairing an SLC 500 Processor for Return to the Customer.

SLC 5/03 · CPU repair · Functional testing

The Challenge

A faulty SLC 5/03 processor was submitted for repair assessment.

Jasper’s Approach

Carried out workshop repair and functional checks on the 1747-L532 processor.

The Result

The processor was repaired, functionally restored and confirmed ready for delivery. This example covers the workshop repair; machine installation was a separate scope.

14 / SLC 5/04 / 1746-HSCE2 / AUGUST 2026

Resolving an Encoder-Difference Alarm on a Movable Saw.

SLC 5/04 · HSCE2 encoder inputs · Feedback diagnosis · Calibration

The Challenge

An aluminium-extrusion movable saw could not complete homing because the motion-control system reported a difference between its encoder feedback signals.

Jasper’s Approach

Connected online to the SLC 5/04 and backed up the program. Checked encoder pulse activity at the 1746-HSCE2, compared the separate feedback systems with the drawings, corrected direction, replaced a transmission-side encoder and calibrated the position system.

The Result

The original encoder-difference alarm cleared and the saw completed the relevant homing movement. A separate intermittent synchronisation issue remained under observation and further investigation; full production readiness was not confirmed.

15 / SLC 500 / EXTRUSION PRESS / OCTOBER 2024

Restoring Communication between a Press PLC and Its HMI.

SLC 500 diagnostics · Serial communication · Interface replacement · Machine testing

The Challenge

The operator interface reported that the SLC 500 PLC was not responding.

Jasper’s Approach

Checked PLC communication indications, cable continuity and the converter supply. Replaced the faulty serial-interface converter and tested communication. Also reviewed the processor condition and tested the machine after CPU replacement.

The Result

PLC-to-HMI communication was restored and the machine worked correctly during testing.

16 / SLC 500 / EXTRUSION PRESS / APRIL 2025

Making Press Output Behaviour Visible through Online Diagnostics.

SLC 500 · Online monitoring · Digital outputs · Plant-team support

The Challenge

The customer needed to investigate solenoid-valve output behaviour on an SLC 500-controlled extrusion press.

Jasper’s Approach

Connected to the PLC using the appropriate Rockwell communication and programming tools, then supported online monitoring of the relevant outputs with the customer.

The Result

Online output monitoring was established, enabling the customer to inspect the control behaviour during troubleshooting.

17 / ALLEN-BRADLEY / FOUR MACHINES / NOVEMBER 2024

Preserving PLC Programs across Four Production Machines.

Allen-Bradley PLCs · Program upload · Backup handover

The Challenge

The plant needed copies of the installed PLC programs to support future maintenance and recovery.

Jasper’s Approach

Established online access and uploaded the programs from four production machines during the site visit.

The Result

The program backups were completed and handed over to the customer on a USB drive.

18 / LEGACY OPERATOR INTERFACE / WORKSHOP-TESTED DEVELOPMENT

Reconstructing an Operator Interface from Available Information.

Legacy-system investigation · HMI redevelopment · S5 program support

The Challenge

The original operator interface was no longer usable, limiting access to production settings on a concrete-block machine. Technical information and compatible legacy spares were limited.

Jasper’s Approach

Researched the available records, PLC backup and operating requirements to reconstruct the agreed operator functions. Developed and workshop-tested an alternative touchscreen interface intended to retain the existing Siemens S5 PLC, alongside ongoing on-site program support.

Stage Reached

Workshop testing was completed successfully. Installation and final functional verification on the actual machine remain the next stage.

19 / PARKER SSD 590+ / PARAMETER TRANSFER

Existing Settings Transferred to a Spare Drive.

Parameter backup · Upload/download · On-site tuning

The Challenge

A production-machine breakdown required a spare Parker SSD 590+ drive to be configured with the original application settings.

Jasper’s Approach

Uploaded parameters from the original unit, downloaded the configuration to the spare, and carried out on-site tuning, testing and debugging.

The Result

Completed the on-site replacement-drive support job after transferring and testing the application settings.

20 / PIPE MILL / SIEMENS SIMOREG 6RA70

Workshop Repair Followed by Machine Commissioning.

DC-drive repair · Parameter support · Machine commissioning

The Challenge

Uneven armature output from the DC drive was associated with vibration in the driven gearbox.

Jasper’s Approach

Repaired the drive and recommissioned it on the machine, with parameter review and operating checks. Wider line-coordination observations were recorded separately.

The Result

The repaired drive was commissioned and confirmed running normally on the machine.

21 / SERVO CONVERSION / EXISTING OMRON PLC

New Servo Equipment. Serviceable PLC Retained.

Servo integration · PLC modification · Commissioning

The Challenge

The stacker used obsolete servo equipment, while its existing Omron PLC control remained serviceable.

Jasper’s Approach

Installed Delta ASD-A2 servo drives and motors, modified the control panel and Omron PLC program, and configured and commissioned the replacement servo systems.

The Result

Restored operation without replacing the complete machine-control system.

22 / BATTERY MANUFACTURING / COMPLETED JANUARY 2016

Preserving the Program in an Operating S5 Machine.

STEP 5 online access · S5-100U backup · Machine checks

The Challenge

The plant required backups of its existing Siemens PLC programs to support future maintenance and recovery.

Jasper’s Approach

Connected to the S5-100U using STEP 5, went online and backed up the program. Also backed up an S7-300 controller during the visit. Tested the machines after the work and transferred the saved backups to the customer.

The Result

The machines were operating normally after backup, and the customer received the program files. Completed in January 2016.

23 / TISSUE PACKAGING / S5-95U / AUGUST 2024

Tracing a PLC-to-HMI Communication Stoppage.

S5-95U diagnostics · PLC/HMI communication · Online program support

The Challenge

A case-packing machine stopped with a communication-timeout fault between its S5-95U PLC and operator interface.

Jasper’s Approach

Went online with the PLC, uploaded the program, investigated the control logic and applied changes to enable operating trials. Checked machine operation and operator-setting changes at different speeds.

Trial Result & Follow-Up

Machine trials were successful. An intermittent HMI communication fault remained; further component isolation and checks of the PLC, cable and HMI were recommended.

24 / CONCRETE-BLOCK MANUFACTURING / ONGOING S5 SUPPORT

Keeping Legacy Controls Aligned with Production Requirements.

Production program changes · Legacy spares · Continued machine support

The Challenge

An established block-manufacturing plant needed continued support for its legacy Siemens controls and changes to production settings while its operator-interface redevelopment was underway.

Jasper’s Approach

Carried out agreed PLC program changes for different production requirements, including thermal-block changes completed in June 2026. Supported obsolete-module enquiries and repair assessment alongside the continuing machine support.

The Result

The requested program changes were completed. Separate operator-interface development reached successful workshop testing, with site installation and final commissioning to follow.